The major problems in charging operation for 7.63m coke oven are analyzed.Optimization for 7.63m coke oven smokeless charging is put forwarded in aspects of charging amount calculation,coal leveling control mode,secondary make-up setting,charging time control,and leveling bar optimization so that production can be improved,such as a stable charging operation,increased charging amount,less spillage coal amount,stabilized coal line and minimized emission leakage.