Optimization and application of water jacket replacement  for  CDQ unit

Wang Xiaojun  Wang Xiaogang  Li Chunyan  Jin Chunxiang   

  1. Coal and Coking Plant of Baotou Iron & Steel Co.,Ltd.,Baotou 014010,China
  • Online:2018-11-23

Abstract:

Conventional and optimized replacement for water jacket for 200t/h CDQ unit are discussed.The optimized solution for replacement can be cut down to 36 hours,much shorter than the conventional solution.Besides,it has less man power,higher efficiency and much lower safety risk.