7.63 m焦炉炉顶翻修技术实践与探索

张增贵  宋前顺  韩学祥  肖和森   

  1. 马鞍山钢铁股份有限公司炼焦总厂, 马鞍山243000
  • 出版日期:2019-03-23

Practice and research in oven roof revamp for 7.63 m coke oven

Zhang Zenggui  Song Qianshun  Han Xuexiang  Xiao Hesen   

  1. General Coking Plant of Masteel Iron & Steel Co.,Ltd.,Ma’anshan 243000,China
  • Online:2019-03-23

摘要:

针对马钢2座7.63 m焦炉炉顶表面平整度变差、装煤孔移位问题,进行了装煤孔底座找正和炉顶表面砖翻修的技术实践,统一装煤孔标高,使炉顶表面形成坡度。对表面砖材质进行改进,并重新设计安全通道砖,翻修效果显著,可为国内超大型焦炉炉顶表面翻修提供参考。

Abstract:

Since problems are found in two blocks of 7.63 m coke oven in Masteel,i.e.the worsened flatness of oven roof and displaced charging hole,revamp is done by restructuring the charging hole frame,re-bricklaying oven roof,re-leveling the charging hole elevation and making a roof slope.Additionally,the roof material is upgraded and the bricks for emergency evacuation lane is modified.All these revamps can be used as reference for similar projects in China.