FUEL & CHEMICAL PROCESSES ›› 2018, Vol. 49 ›› Issue (3): 34-36.
Previous Articles Next Articles
Chen Tingshan Chen Yi He Yutao
Online:
Abstract:
The water condensing system and direct air condensing system for turbine power generation are introduced, and the operation parameters of turbine power generation station in CDQ project are analyzed.The two systems are compared from the aspects of generation capacity,power consumption, investment,land occupation and running cost.
CLC Number:
TQ520.5
Chen Tingshan Chen Yi He Yutao. Analysis and comparison of water condensing system and direct air condensing system for turbine power generation[J]. FUEL & CHEMICAL PROCESSES, 2018, 49(3): 34-36.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://journal03.magtechjournal.com/Jwk3_rlyhg/EN/
https://journal03.magtechjournal.com/Jwk3_rlyhg/EN/Y2018/V49/I3/34