Analysis and comparison of water condensing system and direct air condensing system for turbine power generation

Chen Tingshan  Chen Yi  He Yutao   

  1. ACRE Coking & Refractory Engineering Consulting Corporation,MCC,Dalian 116085,China
  • Online:2018-05-23

Abstract:

The water condensing system and direct air condensing system for turbine power generation are introduced, and the operation parameters of turbine power generation station in CDQ project are analyzed.The two systems are compared from the aspects of generation capacity,power consumption, investment,land occupation and running cost.