FUEL & CHEMICAL PROCESSES ›› 2014, Vol. 45 ›› Issue (5): 40-44.

Previous Articles     Next Articles

Study on coking wastewater treatment by Microwave-Fenton oxidation

Yuan Maobiao    Jin Man    Ding Jianqiang   

  1. School of Chemical Engineering & Technology,Wuhan University of Science and Technology,Wuhan 430081,China
  • Online:2014-09-16

Abstract:

This paper studies the influencing factors such as microwave processing time,microwave power,FeSO4 dosing amount,H2O2 dosing amount,H2O2 dosing times and pH value during coking wastewater treatment by Microwave-Fenton oxidation.The optimum process conditions are determined by the experiment:pH value of wastewater:3,FeSO4 dosing amount:300mg/L,H2O2 total dosing amount of H2O2:900mg/L,H2O2 dosing times:3,microwave power:500W,temperature:50℃,reaction time:30min.the removal rate of turbidity,chroma and COD are 97.59%,95.62% and 86.21% respectively.The wastewater after treatment is clear,and the remaining COD is 50.34mg/L.The turbidity,chroma and COD meet the requirement of industrial recirculating water standard.

CLC Number: