FUEL & CHEMICAL PROCESSES ›› 2023, Vol. 54 ›› Issue (3): 21-23.
Previous Articles Next Articles
Online:
Published:
Abstract: A 140 t/h CDQ in an oversea steel plant has been running overload for a long time and the wall inside the ring duct of CDQ chamber was seriously bulged and a hole about 10 m2 emerged, which led to an emergency shutdown of the chamber for maintenance. After repairing the hole, heat-resistant stainless steel band is used to wind around the ring as one piece, and castables is grouted between the inner and outer walls of the ring duct to form a C-shape support. The CDQ chamber after resumption could maintain more than 90% of its design capacity for up to 13 months continuously
Key words: CDQ chamber, Ring duct, Heat-resistant S.S. bands, C-shape support
CLC Number:
TQ522.16
Dou Heng Shi Yonghong. Application of refractory repairing technology on inner annular wall of 140 t/h CDQ[J]. FUEL & CHEMICAL PROCESSES, 2023, 54(3): 21-23.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://journal03.magtechjournal.com/Jwk3_rlyhg/EN/
https://journal03.magtechjournal.com/Jwk3_rlyhg/EN/Y2023/V54/I3/21
Development of wear-resistant pre-fabricated block and its application on CDQ chamber