FUEL & CHEMICAL PROCESSES ›› 2022, Vol. 53 ›› Issue (3): 42-43.

Previous Articles     Next Articles

Analysis for blockage in gas line after gas exhauster and its solution

Wang Jun1  Chen Haimin1  Liu Xiufeng2   

  1. 1.Coking Plant of HBIS Group Hansteel Company,Handan 056015,China; 2.Hebei Huafeng Energy Technology Development Co.,Ltd.,Handan 056302,China
  • Online:2022-05-23 Published:2022-05-19

Abstract:

In view of the blockage in gas pipeline after the gas exhauster of Handan Iron and Steel Coking Plant,the main reasons are analyzed in this paper.After the improvement,the blockage has been alleviated,and long-term operating regime has been formulated to ensure that the pressure of the gas pipeline after the exhauster does not rise up.

Key words: Primary cooler, Electrostatic Tar Precipitator(ETP), Gas exhauster, Piping blockage

CLC Number: