FUEL & CHEMICAL PROCESSES ›› 2017, Vol. 48 ›› Issue (5): 58-60.
Previous Articles Next Articles
Sun Baodong
Online:
Abstract:
The measures of“Optimizing the existing system,connecting AIS in parallel,and adding Ozone Plus advanced treatment system” are taken to renovate the coking waste water treatment process.After renovation,the discharged waste water meets the standard requirement.This is a new way for the renovation of coking waste water treatment process.
CLC Number:
X784
Sun Baodong. Renovation of coking waste water treatment process[J]. FUEL & CHEMICAL PROCESSES, 2017, 48(5): 58-60.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://journal03.magtechjournal.com/Jwk3_rlyhg/EN/
https://journal03.magtechjournal.com/Jwk3_rlyhg/EN/Y2017/V48/I5/58