全干熄操作模式下汽轮发电站装机方案分析

韩同  陈廷山  何玉涛   

  1. 中冶焦耐(大连)工程技术有限公司, 大连116085
  • 出版日期:2020-01-23 发布日期:2020-02-21

Analysis of configuration for steam turbine power station in total CDQ mode

Han Tong  Chen Tingshan  He Yutao   

  1. ACRE Coking & Refractory Engineering Consulting Corporation (Dalian),MCC,Dalian 116085,China
  • Online:2020-01-23 Published:2020-02-21

摘要:

介绍了全干熄操作模式下汽轮发电站的2种装机方案,从占地、投资、发电量、运行经济性等方面对2种方案进行对比分析,为企业提供参考方案。

关键词: 干熄焦, 汽轮发电站, 装机方案

Abstract: Two configuration options for steam turbine power station in total CDQ mode are introduced.Analysis is also made for the operating parameters of the two types of CDQ turbine power generation systems in aspects of land occupation,investments,generating capacities and operating cost,etc.,which can be used as option reference.