燃料与化工 ›› 2023, Vol. 54 ›› Issue (3): 53-56.

• 环境保护与节能减排 • 上一篇    下一篇

配套加压型 AS 脱硫新工艺焦化废水调试

  

  1. (广西钢铁集团有限公司,防城港 538000)
  • 出版日期:2023-05-23 发布日期:2023-06-08

Commissioning of coking wastewater with a new pressurized AS desulfurization process

  1. (Guangxi Iron and Steel Group Co.,Ltd.,Fangchenggang 538000,China)
  • Online:2023-05-23 Published:2023-06-08

摘要: 对加压型 AS 脱硫新工艺运行后产生的焦化废水水质进行分析。通过对加压型 AS 脱硫新工艺的优化及 对焦化废水处理系统控制参数的摸索,制定了废水处理调试方案。利用该调试方案对焦化废水参数进行调试, 使其达到合格排放要求。

关键词: 焦化废水, 生化, 调试, AS 脱硫

Abstract: The quality of coking wastewater produced after the operation of the new pressurized AS desulfurization process is analyzed. Through the optimization of the new process and the exploration of the control parameters of the coking wastewater treatment system, a commissioning scheme for the wastewater treatment is formulated, by which the parameters of the coking wastewater can be adjusted so as to meet the requirement for waste liquid discharge specification.

Key words: Coking wastewater, Biochemistry, Commissioning, As desulfurization