介绍了马钢耐火材料公司80m长小断面隧道窑的烘窑过程和烘窑要点,指出要做好前期准备工作,准确控制温度和压力,确保烘窑过程的顺利进行。
Abstract:
An introduction is given to the heating-up process and key points for 80m long tunnel kiln with small cross section of the Refractory Materials Company of Masteel. It is pointed out that preparation work should be done well in early stage and temperature and pressure should be controlled accurately to ensure the smooth progress of the heating-up process.
中图分类号:
TQ174.654
刘 青 . 80m长隧道窑烘窑操作方法[J]. 耐火与石灰, 2011, 36(5): 16-18.
Liu Qing . Heating-up operation method for 80m long tunnel kiln[J]. REFRACTORIES & LIME, 2011, 36(5): 16-18.