FUEL & CHEMICAL PROCESSES ›› 2020, Vol. 51 ›› Issue (1): 30-32.
Previous Articles Next Articles
Han Tong Chen Tingshan He Yutao
Online:
Published:
Abstract: Two configuration options for steam turbine power station in total CDQ mode are introduced.Analysis is also made for the operating parameters of the two types of CDQ turbine power generation systems in aspects of land occupation,investments,generating capacities and operating cost,etc.,which can be used as option reference.
Key words: "> CDQ, Steam turbine power station, Configuration option
CLC Number:
TQ520
Han Tong Chen Tingshan He Yutao. Analysis of configuration for steam turbine power station in total CDQ mode[J]. FUEL & CHEMICAL PROCESSES, 2020, 51(1): 30-32.