Abstract: Based on actual situation of 4.3 m coke oven in Jiugang Coking Plant and by analysis of the process,the safe shutdown scheme is prepared and implemented.On the precondition of smooth production,safety and environmental protection, the operation procedure is summarized,i.e.to cut off crude gas transferring system and push all the ovens empty.
Key words: "> Coke oven shutdown scheme, Crude gas, Oven empty operation
CLC Number:
TQ520.5
Cao Shihai Mu Biao Cai Mingzhu. Practice of shutdown for 4.3 m coke oven of Jiugang Coking Plant[J]. FUEL & CHEMICAL PROCESSES, 2020, 51(1): 8-10.