FUEL & CHEMICAL PROCESSES ›› 2019, Vol. 50 ›› Issue (2): 35-36.

Previous Articles     Next Articles

Repair for the refractory brickwork after complete cooling of coke oven

Peng Ningning  Hou Yaohua   

  1. Yuzhong Iron & Steel Co.,Ltd.of JISCO,Lanzhou 730104,China
  • Online:2019-03-23

Abstract:

With upturning of steel industry,4.3 m coke oven battery that has been cooled down to normal temperature can be repaired.The current situation of the coke oven refractory brickwork is introduced,including the brickwork repair procedures and precautions.The repaired coke oven can be put back to production,with less emission and flame leakage.