FUEL & CHEMICAL PROCESSES ›› 2017, Vol. 48 ›› Issue (4): 20-21.
Previous Articles Next Articles
Yan Junxi Yang Qingbin Peng Junshan Zhu Changjun
Online:
Abstract:
This paper introduces steel rope replacing for CDQ system.The optimized maintenance solution enables a rational annual maintenance schedule for the CDQ system,which minimizes the replacement time,extends the annual maintenance intervals at most and ensures a safe production in the long run.
CLC Number:
TQ520.5
Yan Junxi Yang Qingbin Peng Junshan Zhu Changjun. Optimization and utilization of steel rope maintenance for 260t/h CDQ system[J]. FUEL & CHEMICAL PROCESSES, 2017, 48(4): 20-21.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://journal03.magtechjournal.com/Jwk3_rlyhg/EN/
https://journal03.magtechjournal.com/Jwk3_rlyhg/EN/Y2017/V48/I4/20