FUEL & CHEMICAL PROCESSES ›› 2015, Vol. 46 ›› Issue (6): 16-18.

Previous Articles     Next Articles

Problems in CDQ discharging device and improvement

Li Shibing  Chen Lijin   

  1. (Iron-making Plant of Pangang Group Steel Vanadium & Titanium Co.,Ltd.,Panzhihua,617022,China
  • Online:2015-11-12

Abstract:

Study and improvement have been carried out regarding to the problems found during operation of CDQ discharging device.After improvement,failure of the equipment is reduced,and the running stability of the system is improved greatly.The production requirement can be met.This paper provides technical reference for the reliable and stable running of similar process equipment.

CLC Number: