FUEL & CHEMICAL PROCESSES ›› 2015, Vol. 46 ›› Issue (2): 34-35.
Previous Articles Next Articles
Jiang Zhongping1 Zhu Tingting2
Online:
Abstract:
This paper introduces a method for overall repair of the bottom bricks of coking chamber,and proposes a control plan for temperature management during repairing.Practical production shows that the repaired coking chamber has similar indexes with other coking chambers,and from which coke can be pushed out easily.Therefore,the risk of high temperature radiation to human body is reduced and the service life of coke oven is prolonged.
CLC Number:
TQ520.5
Jiang Zhongping1 Zhu Tingting2. Repair of the bottom bricks of 6m coke oven coking chamber[J]. FUEL & CHEMICAL PROCESSES, 2015, 46(2): 34-35.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://journal03.magtechjournal.com/Jwk3_rlyhg/EN/
https://journal03.magtechjournal.com/Jwk3_rlyhg/EN/Y2015/V46/I2/34