FUEL & CHEMICAL PROCESSES ›› 2014, Vol. 45 ›› Issue (3): 31-33.
Previous Articles Next Articles
Zhang Jimin Xiang Yu Jin Yingwu Zhang Sufen
Online:
Abstract:
The process of 190t/h double chut CDQ in Anyang Steel,and the application of some key equipment such as heat-pipe exchanger,double chute,multi-tube cyclone separation de-dustor were described.Practical production shows that the application of such equipment can increase the utilization of CDQ heat power,reduce the possibility of coke floating,improve CDQ de-dusting effect,and provide favorable conditions for the stable running of the whole CDQ system.
CLC Number:
TQ520.6
Zhang Jimin Xiang Yu Jin Yingwu Zhang Sufen. Application of 190t/h double chut CDQ in Anyang Steel[J]. FUEL & CHEMICAL PROCESSES, 2014, 45(3): 31-33.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://journal03.magtechjournal.com/Jwk3_rlyhg/EN/
https://journal03.magtechjournal.com/Jwk3_rlyhg/EN/Y2014/V45/I3/31