FUEL & CHEMICAL PROCESSES ›› 2018, Vol. 49 ›› Issue (5): 28-29.

Previous Articles     Next Articles

Improvement and optimization of CDQ locomotive for 7m coke oven

Zhou Xiaofeng1  Zhang Yundong1  Shi Zhonglai2  Zhang Qifeng1  Gao Wei1   

  1. 1.General Coking Plant of Ansteel Co.,Ltd.,Anshan 114000,China;2.ACRE Coking & Refractory Engineering Consulting Corporation,MCC,Dalian 116085,China
  • Online:2018-09-10

Abstract:

CDQ bucket car locomotive technology for 7m coke oven is introduced in this paper.Improvement and optimization have been done for the problems and defects in production by modifying equipment and adjusting parameters,etc.so as to ensure a stable operation for the CDQ locomotive.

CLC Number: