FUEL & CHEMICAL PROCESSES ›› 2017, Vol. 48 ›› Issue (6): 33-35.

Previous Articles     Next Articles

Improvement on the inlet duct lining of CDQ waste heat boiler

Xu Jiguo  Liu Zhanbo  Ma Yinhua  Yin Degang   

  1. Cokemaking Section of Bayuquan Iron & Steel Subsidiary Company of AnSteel Co.,Ltd.,Yingkou 115007,China
  • Online:2017-11-20

Abstract:

In this paper,analysis is made for the causes to the damage at outer shell of the inlet duct of WHB (waste heat boiler).Improvements are also given for a better inlet duct lining structure,i.e.the original monolith concreted arch is changed to wedge type brick-laid arch structure,which runs very well without any problem and with extended service life of the WHB inlet duct,stabilized CDQ production and less operating cost.

CLC Number: