FUEL & CHEMICAL PROCESSES ›› 2016, Vol. 47 ›› Issue (5): 48-51.

Previous Articles     Next Articles

Development of medium temperature modified asphalt without intermediate phase

Yang Yang  Du Yaping  Liu Jianzhong  Xu Chao   

  1. Meishan Branch,Shanghai Baosteel Chemical Co.,Ltd.,Nanjing 210039,China
  • Online:2016-09-10

Abstract:

Quality requirement on raw material and production process parameters for production of medium temperature modified asphalt without intermediate phase are determined through thermal polymerization tests with different raw materials.Qualified medium temperature modified asphalt without intermediate phase can be produced by adjusting tar distillation and asphalt modification parameters.

CLC Number: