FUEL & CHEMICAL PROCESSES ›› 2013, Vol. 44 ›› Issue (4): 26-27.

Previous Articles     Next Articles

Optimization of installation method for CDQ crane

Sun Lianji    Li Zizheng    Guo Changfeng   

  1. ACRE Coking & Refractory Engineering Consulting Corporation,MCC,Dalian 116085,China
  • Online:2013-07-26

Abstract:

This paper introduces a method of selecting suitable crane to be accessible and approaching to the lifting site due to the narrow space at the CDQ construction site,which can save lifting cost,make installation easy and shorten lifting time.

CLC Number: