介绍了200t/h干熄焦水冷套管的传统和优化更换方案,优化更换方案更换工期缩短至36h,较传统更换方案节省了大量时间,并且施工人员少、效率高,安全隐患大大降低。

Abstract:

Conventional and optimized replacement for water jacket for 200t/h CDQ unit are discussed.The optimized solution for replacement can be cut down to 36 hours,much shorter than the conventional solution.Besides,it has less man power,higher efficiency and much lower safety risk.