摘要: 对武钢焦化公司 2 座 7.63 m 焦炉全部 144 个蓄热室的格子砖进行通排式更换,解决了因格子砖变形造
成的焦炉低温问题。焦炉横墙系数由原来的 0.5 提升到了 0.88,焦炭质量得到提高,并消除了因焦炭不成熟带
来的环保风险。

关键词: 7.63 m 焦炉, 蓄热室格子砖, 通排式更换, 横墙系数

Abstract: The checker bricks of all 144 regenerators for two 7.63 m coke ovens of WISCO Co.,Ltd. were replaced in complete row,which solved the problem of insufficient temperature of coke oven due to checker brick deformation. The lateral wall coefficient of coke oven is increased from 0.5 to 0.88,and coke quality is  improved,preventing potential environmental problems caused by not fully-coking coke.

Key words:  , 7.63 m coke oven, Regenerator checker brick, Replacement of bricks in complete row,
 ,