REFRACTORIES & LIME ›› 2015, Vol. 40 ›› Issue (4): 17-19.

Previous Articles     Next Articles

Process optimization of pulverized coal preparation system for 1 million tons lime production line

Lin Xuedan   

  1. Dalian Huarui Heavy Industry Group Co.,Ltd., Dalian 116013, China
  • Online:2015-08-10 Published:2015-08-10

Abstract:

According to the initial conditions of local raw coal and the requirements for limestone calcination and capacities of 5 lime kilns of 600t·d-1,a lime production line with the  annual output of  1 million tons are equipped with a pulverized coal preparation system. Aiming at the problems of pulverized coal preparation system before,some improvement measures are present in the design process and finally verified by actual production.

CLC Number: