REFRACTORIES & LIME ›› 2015, Vol. 40 ›› Issue (4): 17-19.
Previous Articles Next Articles
Lin Xuedan
Online:
Published:
Abstract:
According to the initial conditions of local raw coal and the requirements for limestone calcination and capacities of 5 lime kilns of 600t·d-1,a lime production line with the annual output of 1 million tons are equipped with a pulverized coal preparation system. Aiming at the problems of pulverized coal preparation system before,some improvement measures are present in the design process and finally verified by actual production.
CLC Number:
TQ175.653
Lin Xuedan. Process optimization of pulverized coal preparation system for 1 million tons lime production line[J]. REFRACTORIES & LIME, 2015, 40(4): 17-19.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://journal03.magtechjournal.com/Jwk3_nhysh/EN/
https://journal03.magtechjournal.com/Jwk3_nhysh/EN/Y2015/V40/I4/17
Analysis and solving methods for causes of ringing in gas-burning lime rotary kiln