REFRACTORIES & LIME ›› 2018, Vol. 43 ›› Issue (4): 8-11.

Previous Articles     Next Articles

Practice on  quality improvement of  3# Maerz kiln in LiuGang

Li Lei   

  1. Converter Plant of Liuzhou Iron and Steel Co.,Ltd., Liuzhou 545002,China
  • Online:2018-08-10 Published:2018-08-10

Abstract:

The quality fluctuation of 3# Maerz kiln is analyzed.The problems such as gas valve blockage,gas ring pipe blockage,low calorific value of the gas,water leakage on gas booster is sovled,and finally the quality stability of Maerz kiln is improved.

CLC Number: