FUEL & CHEMICAL PROCESSES ›› 2023, Vol. 54 ›› Issue (5): 49-52.

Previous Articles     Next Articles

Production control of high softening point modified pitch

  

  1. (Baowu Carbon Technology Co.,Ltd. - Meishan Branch,Nanjing 210039,China)
  • Online:2023-09-23 Published:2023-09-13

Abstract:

By increasing the temperature of the reactor,raising the vacuum level of the flash tank,and optimizing the process flow of the original modified asphalt plant,modified pitch with a high softening point of 118~130 ℃ and a coking value greater than 60% was produced.

Key words: