FUEL & CHEMICAL PROCESSES ›› 2018, Vol. 49 ›› Issue (3): 11-13.

Previous Articles     Next Articles

Improvement and optimization of CDQ No.6 in MaSteel

Yan Xiangyu1  Li Guomian1  Chen Songqing2   

  1. 1.ACRE Coking & Refractory Engineering Consulting Corporation,MCC,Dalian 116085,China; 2.Coal & Coking Co.,Ma’anshan Iron& Steel Co.,Ltd.,Ma’anshan 243000,China
  • Online:2018-05-23

Abstract:

The proper and process equipment of CDQ are improved and optimized by increasing the volume of prechamber,adopting double flue technology,improving the performance of refractories,optimizing the charging device,modifying the secondary de-duster and optimizing the crane system.After improvement,the temperature of discharged coke is reduced to 140℃,the utilization rate of waste heat is increased,and coke supply to the blast furnace can be ensured.