FUEL & CHEMICAL PROCESSES ›› 2016, Vol. 47 ›› Issue (6): 37-38.

Previous Articles     Next Articles

Improvement on CPS system for the coke oven battery in Jisteel

Xu Ming   

  1. Iron-making Plant of Jinan Brach,Shandong Iron & Steel Co.,Ltd.,Jinan 250101,China
  • Online:2016-11-11

Abstract:

Regarding to the problems of high temperature at the installation position,difficulty in maintenance and low adjustment accuracy of the actuator in CPS system,improvements have been made by changing the position of actuator and installation of connecting bar. Maintenance is less difficult after improvement,and the service life of CPS system is prolonged.

CLC Number: