FUEL & CHEMICAL PROCESSES ›› 2016, Vol. 47 ›› Issue (4): 21-23.

Previous Articles     Next Articles

Probe into and practice of half-load operation of CDQ

Tian Gang  Wang Guohui   

  1. Iron Works,Shanghai Meishan Iron & Steel Group Co.,Ltd.,Nanjing 210039,China
  • Online:2016-07-20

Abstract:

The actual situation of a 190t/h CDQ system working at half load is presented in this paper.Main parameters such as operation parameters of the secondary de-duster and temperature at the inlet of CDQ chamber have been tracked and optimized in a bid to provide support and help for half-load operation of CDQ under special conditions in the future.

CLC Number: