焦炉煤气制液化天然气工程的总图设计要点

薛瑞琛  张超   

  1. 中冶焦耐工程技术有限公司,大连 116085
  • 出版日期:2015-07-10

Key point for general layout of LNG project from COG

Xue Ruichen  Zhang Chao   

  1. ACRE Coking & Refractory Engineering Consulting Corporation,MCC,Dalian 116085,China
  • Online:2015-07-10

摘要:

焦炉煤气制LNG已成为焦炉煤气利用的新途径。介绍了LNG的特性、焦炉煤气制LNG的工艺流程及总图运输专业适用规范,并详细介绍了总平面布置要点。

Abstract:

LNG production from COG has become a new utilization of COG.This paper introduces the features of LNG,process flow of LNG production from COG and the applicable codes for general layout and transportation design.The key point for general layout is described in detail in this paper.