In order to save energy, reduce consumption and control cost, reformation of transmission gear, valve and gas pipeline of friction press was carried out to solve the problems of low efficiency of energy and air leakage in molding of silica brick. Meanwhile, reformation of ejection gun of nature gas nozzle and spinning disk in tunnel kiln for firing silica bricks was also carried out to reduce the production cost and firing cost.