Other articles related with "

TQ174.654

":
  Liu Qing
  Heating-up operation method for 80m long tunnel kiln
    REFRACTORIES & LIME   2011 Vol.36 (5): 16-18 [Abstract] (313) [PDF 0 KB] (49)
  Cheng Weifeng
  Measures to be taken for gas fired lime shaft-kiln fired with coke oven gas
    REFRACTORIES & LIME   2011 Vol.36 (5): 19-21 [Abstract] (473) [PDF 0 KB] (49)