REFRACTORIES & LIME ›› 2022, Vol. 47 ›› Issue (1): 29-31.

Previous Articles     Next Articles

Analysis and discussion on ignition and heating-up problems in Maerz kiln

Li Lei  Tang Wenhua   

  1. Guangxi Liugang New Material Technology Co.,Ltd., Liuzhou 545002, China
  • Online:2022-02-10 Published:2022-01-30

Abstract:

This paper introduces the operation process of ignition and heating-up for the Maerz kiln,analyzes the common problems in the furnace,and puts forward some solutions and corresponding optimization measures to ensure the smooth running of the kiln.

Key words:

CLC Number: