浅论RH炉工程施工阶段的质量控制

倪红强   

  1. 江苏宜兴新威利成耐火材料有限公司, 宜兴214226
  • 出版日期:2015-02-10 发布日期:2015-02-10

Discussion on quality control in construction stage of RH furnace

Ni Hongqiang   

  1. Yixing Xinwei Leeshing Refractory Materials Co.,Ltd., Jiangsu Province, Yixing 214226, China
  • Online:2015-02-10 Published:2015-02-10

摘要:

耐火材料施工是形成RH炉工程项目实体的过程,也是形成最终精炼炉的重要阶段。所以,RH炉施工阶段的质量控制是工程项目质量控制的重点。本文将主要对RH炉工程施工阶段质量控制的内容进行分析,就如何加强施工阶段的质量控制提出一些看法。

Abstract:

Refractory construction process is the forming process of RH furnace project entity and the important stage of the formation of final refining furnace. So, the quality control of RH furnace construction stage is the key point of the quality control in the whole project. This paper mainly analyzes the quality control in construction stage of RH furnace and proposes some opinions on strengthening quality control of the construction stage.